Water Damage Restoration Checklist

    Tick the steps as you work, or print a blank copy for the truck. Nothing to sign up for, nothing emailed.

    0 of 84 steps complete

    Last updated:

    What does this checklist cover?

    Eleven sections, in the order the work actually happens on a water loss, from the electrical check at the door to the signed completion at the end. Each section carries the field steps that get missed most often — the dry standard nobody took, the cut line nobody photographed, the dehumidifier nobody checked the exhaust on. The sequence itself is the standard order of work; the ANSI/IICRC S500 page explains what the standard is and where to buy the current edition.

    Tick boxes stay ticked while the page is open, the counter shows how much of the job is documented, and Clear resets it for the next loss. Print gives you the checklist with your job details and no navigation, buttons or promotional blocks on the page.

    How do you use it on a live job?

    Fill the job header once, then work top to bottom. The four sections that decide whether the file holds up are Category and Class, moisture mapping, daily monitoring and closeout — everything else is visible work that photographs itself. Pair it with the drying log template for the daily readings and the moisture mapping template for the point-by-point history.

    Studying rather than working a loss? The same sequence is what scenario questions on the WRT exam are built around: they give you a set of conditions and ask which step comes next.

    Running more than one job at a time? Restoration software such as RestorationWorkflow, a sister product of this site, keeps the inspection checklist, photos and reports on the job record instead of on paper.

    Frequently asked questions

    Safety and inspection, then stopping the source, then Category and Class, then moisture mapping, extraction, removal, equipment, daily monitoring, verification against drying goals and closeout. That is the standard order of work in the industry, and the ANSI/IICRC S500 is the document that describes it in full.

    It depends on the Category and how long the pad has been wet. Pad affected by clean-source water caught quickly is sometimes dried in place with floating and directed airflow; pad wet with contaminated water is removed. Record the decision and the reason in the file either way.

    After. Cleaning and physical removal of contamination come first, and any product goes onto cleaned surfaces where its label allows that use. Spraying over debris leaves the contamination in the building and leaves you with a treatment record that does not match the site.

    Each affected material has a written drying goal taken from a dry standard in the same building, and the numbered monitoring points hold at or below that goal on consecutive readings. A calendar day count is not a completion test.

    No. It is a working checklist for the field. Buy the current edition of the standard from the IICRC for the authoritative text, and use the checklist to keep the sequence and the documentation consistent between technicians.